Reference Projects

ESTEC SUPPLIES AND CONSTRUCTS ELECTRICAL SYSTEM - AUTOMATION CONTROL FOR SUN WORLD WATER PARK SAM SON - THANH HOA

ESTEC SUPPLIES AND CONSTRUCTS ELECTRICAL SYSTEM - AUTOMATION CONTROL FOR SUN WORLD WATER PARK SAM SON - THANH HOA

Customer name: SunGroup Corporation

Project implementation location: Sun World Sam Son Water Park.

Project implementation time: 2024

Read more
 SUPPLY INSTALLATION OF ELECTRICAL CONTROL SYSTEM FOR SUNGROUP

SUPPLY INSTALLATION OF ELECTRICAL CONTROL SYSTEM FOR SUNGROUP

Customer name: SunGroup Corporation

Project implementation location: Pearl Island Phu Quoc

Project implementation time: 2021-2022

Read more
 AIR LIQUIDE INDUSTRIAL GAS FACTORY EXPAND PROJECT

AIR LIQUIDE INDUSTRIAL GAS FACTORY EXPAND PROJECT

Customer name: AIR LIQUIDE VIETNAM CO., LTD

Project implementation location: Saigon Hi-Tech Park, District 9, City. Thu Duc, Ho Chi Minh

Project implementation time: 2021-2022

Read more
 SUPPLY INDUSTRIAL WEIGHT WEIGHT

SUPPLY INDUSTRIAL WEIGHT WEIGHT

Customer name: Doosan Vina Heavy Industry Co., Ltd

Customer address: Dung Quat Economic Zone, Binh Thuan Commune, Binh Son District, Quang Ngai Province, Vietnam

Industry: Manufacture of heavy industrial equipment.

Implementation time: 2022

Read more
SUPPLY CONTROL BOX, PROGRAMMING CONTROL & MONITORING SYSTEMS

SUPPLY CONTROL BOX, PROGRAMMING CONTROL & MONITORING SYSTEMS

Investor: CMC Telecom Client's

Project location: District 7, Ho Chi Minh City

Project implementation time: 2021

Read more
MESSER-H PLANT WITH CATALYTIC HOT OIL SYSTEM

MESSER-H PLANT WITH CATALYTIC HOT OIL SYSTEM

Customer name: Messer Gasses Industrial Gas

Company Industry: Liquefied Petroleum Gas

Project implementation location: Thai Nguyen. Implementation time: 2022

Read more
 WINCC OA SOFTWARE LICENSE SUPPLY – SAMSUNG SDS VIETNAM

WINCC OA SOFTWARE LICENSE SUPPLY – SAMSUNG SDS VIETNAM

Customer name: SAMSUNG SDS VIETNAM CO., LTD

Project implementation location: Bien Hoa City, Dong Nai

Project implementation time: 2021

ESTEC provides the WinCC OA software license from Siemens and design and programming services to monitor power consumption, capacity and information of the entire plant. The system gives visual warnings and error statuses to help operators check the status and have a timely handling plan.

Read more
ENERGY MANAGEMENT SYSTEM FOR VINAMILK DAIRY FARM

ENERGY MANAGEMENT SYSTEM FOR VINAMILK DAIRY FARM

- Customer name: Vietnam Dairy Cow One Member Company Limited (VINAMILK)

- Customer's address: 10 Tan Trao, Tan Phu ward, district 7, HCMC

- Industry: Food & Beverage (Food & Beverage) - Project implementation location: Mo Duc - Quang Ngai

- Project implementation time: 2021-2022

Read more
ESTEC HAD SUPPLIED AND INSTALLED FLENDER GEARBOX

ESTEC HAD SUPPLIED AND INSTALLED FLENDER GEARBOX

End User: Hon Chong INSEE

Year: 2019, 2021

Scope of Work: In 2019 , 2021; ESTEC had supplied and installed Flender gearbox.

Read more
ELECTRICAL CABLE AND CONTROL PANELPAINT FINISHING TECHNOLOGY & SYSTEM

ELECTRICAL CABLE AND CONTROL PANEL PAINT FINISHING TECHNOLOGY & SYSTEM

Customer: PERFECT PAINT TECHNOLOGY CO. LTD.

Customer Address:
Road 2B, Dong An Industrial Park, Binh Hoa Ward, Thuận An City, Binh Duong Province, Vietnam

Industry: Paint Manufacturing

Project Implementation Period: 2020

Read more
UPGRADE HARDWARE S5 TO S7 FOR STATIONS IP71, IP72

UPGRADE HARDWARE S5 TO S7 FOR STATIONS IP71, IP72

Customer Name: VICEM BUT SON CEMENT COMPANY.

Location: Thanh Son Commune, Kim Bang District, Ha Nam Province, Vietnam.

Industry: Cement.

Project Location: Thanh Son Commune, Kim Bang District, Ha Nam Province, Vietnam.

Year: 2020.

Read more
CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) - OUTSPAN

CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) - OUTSPAN

Investor: CAFÉ OUTSPAN VIETNAM COMPANY LIMITED.

Location: L1, Nhut Chanh Industrial Park, Nhut Chanh Commune, Ben Luc District, Long An.

Industry: Food & Beverage.

Year: 2019.

Scope: ESTEC designs, supplies equipment, constructs, monitoring system.

Read more
ELECTRICAL AND INSTRUMENTATION & CONTROL SYSTEM OF MESSER DUNG QUAT

ELECTRICAL AND INSTRUMENTATION & CONTROL SYSTEM OF MESSER DUNG QUAT

Investor: MESSER HAI PHONG INDUSTRIAL GASES COMPANY LIMITED – DUNG QUAT BRANCH.

Industry: Industrial Gases.

Customer address: Tan Hy, Binh Dong, Binh Son, Quang Ngai.

Project location: Dung Quat - Quang Ngai.

Year: 2018 - 2019.

Scope: Constructs and installation of medium voltage, low voltage systems (MV, LV, M & E), DCS control system, measuring equipment And supply equipment: Cable tray, Cable control and lighting systems, lightning protection, earthing.

Read more
HON THOM WATER PARK PROJECT

HON THOM WATER PARK PROJECT

Customer name: SUNGROUP – SUNGROUP JOINT STOCK COMPANY.

Address: 65 Tran Hung Dao Street, Hoan Kiem District, Hanoi.

Project Location: Hon Thom, Phu Quoc.

Year: 2019.

Scope: 

Contractor must provide good technical solutions, high quality of products & services with competitive price for electrical and control system, instrumentation for water games and water treatment plant. Main equipment such as PLC, HMI, VSD, CB, Contactor, Electrical enclosure, instrumentation must be EU/G7 brand names. High quality of hardware and software engineering.

Read more
COOLING WATER MAKE UP PROJECT

COOLING WATER MAKE UP PROJECT

Customer Name: GREEN RESOURCES ENVIRONMENTAL INDUSTRIAL ENGINEERING JOINT STOCK COMPANY – GR INDTECH CORP.

Customer Address: 27 Le Trung Nghia Street, Ward 12, Tan Binh District, Ho Chi Minh City.

Industry: Fertilizers – Chemicals.

Year: 2017.

Scope: ESTEC consulting and providing to PVFCCo using WinCC and PLC S7-400H apply to water filtration process in order to supply cooling water for production.

Read more
UPGRADE CONTROLLER CEMAT - INSEE THI VAI

UPGRADE CONTROLLER CEMAT - INSEE THI VAI

Investor: INSEE THI VAI TERMINAL.

Location: Phu My, Ba Ria, Vung Tau.

Year: 2017.

Scope: Upgrade CEMAT Controller.

Read more
TRANSFORMER OIL PURIFICATION SERVICES - PHU MY 3 BOT POWER

TRANSFORMER OIL PURIFICATION SERVICES - PHU MY 3 BOT POWER

Investor: PHU MY BOT ELECTRICITY COMPANY LIMITED.

Location: Phu My, Ba Ria.

Contractor: Siemens EM.

Year: 2018.

Scope: Provision of Transformer Oil Re-generation services (Sitram-Reg).

Read more
PCS7 UPGRADE - LAM DONG ALUMINUM

PCS7 UPGRADE - LAM DONG ALUMINUM

Investor: LAM DONG ALUMINUM.

Location: Tan Rai, Lam Dong.

Year: 2017.

Scope: Upgrade Simatic PCS7 Coal Gas Workshop.

Read more
LPG SYSTEM UPGRADE - TOTAL

LPG SYSTEM UPGRADE - TOTAL

Investor: TOTAL.

EPC: TTCL.

Location: Go Dau, Dong Nai.

Year: 2017.

Scope: LPG System Upgrade.

Read more
SUPPLYING EQUIPMENT AND CONTROL PRODUCTION OPERATION SYSTEM

SUPPLYING EQUIPMENT AND CONTROL PRODUCTION OPERATION SYSTEM

Investor: GREENFEED.

Location: Vinh Long.

Year: 2018.

Scope: ESTEC consulting and providing to GreenFeed usingTIA Portal V14 SP1 and SIMATIC S7-1500, ET200SP apply to monitor and control the production operation system, production reports for GreenFeed Vinh Long factory.

Read more
PERSONAL CARE PLANT 05TON MIXER – UNILEVER

PERSONAL CARE PLANT 05TON MIXER – UNILEVER

Investor: UNILEVER.

Location: Personal Care Plant, Cu Chi, HCMC

Year: 2014-2015

Scope: Control Cabinet, MCC; Local Cabling Control Cabinel

Read more
VAM INTERLOCK SAFETY SYSTEM - SYNTHOMER

VAM INTERLOCK SAFETY SYSTEM - SYNTHOMER

Investor: SYNTHOMER.

Location: Song Than IZ, Binh Duong.

Year: 2017.

Scope: Safety PLC Panel.

Read more
HOME CARE LIQUID PHASE 3 - UNILEVER

HOME CARE LIQUID PHASE 3 - UNILEVER

Investor: UNILEVER.

Location: Cu Chi, Ho Chi Minh City.

Year: 2014 - 2015.

Scope: Upgrade DCS and Batching System at Personal Care Plant.

Read more
SUPPLYING CONTROL SYSTEM AND INSTRUMENTATION FOR BMS - TETRA PAK

SUPPLYING CONTROL SYSTEM AND INSTRUMENTATION FOR BMS - TETRA PAK

Investor: TETRA PAK.

Location: Binh Duong.

Year: 2018.

Scope:  ESTEC provided field equipment, sensors and BMS control system for the factory using TIA Portal V14 SP1 and PLC S7-1500 and SCADA Webfactory software to manage and optimize energy to ensure LEED certificate.

Read more
WASTE WATER TREATMENT PLANT - YKK

WASTE WATER TREATMENT PLANT - YKK

Investor: YKK.

Contractor: Kobelco.

Location: Nhon Trach, Dong Nai.

Year: 2016.

Scope: Supply and installation of control panels and MCC panels for Wastewater Treatment Plant.

Read more
AUTOMATION SYSTEM – PLC & SCADA DAP 2

AUTOMATION SYSTEM – PLC & SCADA DAP 2

Investor: DAP 2 LAO CAI PLANT.

Location: Lao Cai.

Contractor: TVC.

Year: 2014.

Scope: Control system for DEMIN water station.

Read more
PROCESS CONTROL SYSTEMS PCS7 - MESSER

PROCESS CONTROL SYSTEMS PCS7 - MESSER

Investor: MESSER INDUSTRIAL GASSES LIMITED - HAI PHONG

Location: Hai Duong.

Year: 2015 - 2016.

Scope: Simatic PCS7 Process Control Systems.

Read more
DCS SYSTEM FOR BUT SON CEMENT PLANT

DCS SYSTEM FOR BUT SON CEMENT PLANT

Investor: VICEM BUT SON CEMENT.

Location: Kim Bang, Ha Nam.

Year: 2016.

Scope: Upgraded control system software CEMAT V7; Upgraded weight scale and flow meter systems.

Read more
MESSER-H PLANT WITH CATALYTIC HOT OIL SYSTEM

MESSER-H PLANT WITH CATALYTIC HOT OIL SYSTEM

Customer name: Messer Gasses Industrial Gas

Company Industry: Liquefied Petroleum Gas

Project implementation location: Thai Nguyen. Implementation time: 2022

Read more
COOLING WATER MAKE UP PROJECT

COOLING WATER MAKE UP PROJECT

Customer Name: GREEN RESOURCES ENVIRONMENTAL INDUSTRIAL ENGINEERING JOINT STOCK COMPANY – GR INDTECH CORP.

Customer Address: 27 Le Trung Nghia Street, Ward 12, Tan Binh District, Ho Chi Minh City.

Industry: Fertilizers – Chemicals.

Year: 2017.

Scope: ESTEC consulting and providing to PVFCCo using WinCC and PLC S7-400H apply to water filtration process in order to supply cooling water for production.

Read more
LPG SYSTEM UPGRADE - TOTAL

LPG SYSTEM UPGRADE - TOTAL

Investor: TOTAL.

EPC: TTCL.

Location: Go Dau, Dong Nai.

Year: 2017.

Scope: LPG System Upgrade.

Read more
PROCESS CONTROL SYSTEMS PCS7 - MESSER

PROCESS CONTROL SYSTEMS PCS7 - MESSER

Investor: MESSER INDUSTRIAL GASSES LIMITED - HAI PHONG

Location: Hai Duong.

Year: 2015 - 2016.

Scope: Simatic PCS7 Process Control Systems.

Read more
 AIR LIQUIDE INDUSTRIAL GAS FACTORY EXPAND PROJECT

AIR LIQUIDE INDUSTRIAL GAS FACTORY EXPAND PROJECT

Customer name: AIR LIQUIDE VIETNAM CO., LTD

Project implementation location: Saigon Hi-Tech Park, District 9, City. Thu Duc, Ho Chi Minh

Project implementation time: 2021-2022

Read more
ELECTRICAL CABLE AND CONTROL PANELPAINT FINISHING TECHNOLOGY & SYSTEM

ELECTRICAL CABLE AND CONTROL PANEL PAINT FINISHING TECHNOLOGY & SYSTEM

Customer: PERFECT PAINT TECHNOLOGY CO. LTD.

Customer Address:
Road 2B, Dong An Industrial Park, Binh Hoa Ward, Thuận An City, Binh Duong Province, Vietnam

Industry: Paint Manufacturing

Project Implementation Period: 2020

Read more
ELECTRICAL AND INSTRUMENTATION & CONTROL SYSTEM OF MESSER DUNG QUAT

ELECTRICAL AND INSTRUMENTATION & CONTROL SYSTEM OF MESSER DUNG QUAT

Investor: MESSER HAI PHONG INDUSTRIAL GASES COMPANY LIMITED – DUNG QUAT BRANCH.

Industry: Industrial Gases.

Customer address: Tan Hy, Binh Dong, Binh Son, Quang Ngai.

Project location: Dung Quat - Quang Ngai.

Year: 2018 - 2019.

Scope: Constructs and installation of medium voltage, low voltage systems (MV, LV, M & E), DCS control system, measuring equipment And supply equipment: Cable tray, Cable control and lighting systems, lightning protection, earthing.

Read more
VAM INTERLOCK SAFETY SYSTEM - SYNTHOMER

VAM INTERLOCK SAFETY SYSTEM - SYNTHOMER

Investor: SYNTHOMER.

Location: Song Than IZ, Binh Duong.

Year: 2017.

Scope: Safety PLC Panel.

Read more
AUTOMATION SYSTEM – PLC & SCADA DAP 2

AUTOMATION SYSTEM – PLC & SCADA DAP 2

Investor: DAP 2 LAO CAI PLANT.

Location: Lao Cai.

Contractor: TVC.

Year: 2014.

Scope: Control system for DEMIN water station.

Read more
ESTEC SUPPLIES AND CONSTRUCTS ELECTRICAL SYSTEM - AUTOMATION CONTROL FOR SUN WORLD WATER PARK SAM SON - THANH HOA

ESTEC SUPPLIES AND CONSTRUCTS ELECTRICAL SYSTEM - AUTOMATION CONTROL FOR SUN WORLD WATER PARK SAM SON - THANH HOA

Customer name: SunGroup Corporation

Project implementation location: Sun World Sam Son Water Park.

Project implementation time: 2024

Read more
 SUPPLY INSTALLATION OF ELECTRICAL CONTROL SYSTEM FOR SUNGROUP

SUPPLY INSTALLATION OF ELECTRICAL CONTROL SYSTEM FOR SUNGROUP

Customer name: SunGroup Corporation

Project implementation location: Pearl Island Phu Quoc

Project implementation time: 2021-2022

Read more
SUPPLY CONTROL BOX, PROGRAMMING CONTROL & MONITORING SYSTEMS

SUPPLY CONTROL BOX, PROGRAMMING CONTROL & MONITORING SYSTEMS

Investor: CMC Telecom Client's

Project location: District 7, Ho Chi Minh City

Project implementation time: 2021

Read more
 WINCC OA SOFTWARE LICENSE SUPPLY – SAMSUNG SDS VIETNAM

WINCC OA SOFTWARE LICENSE SUPPLY – SAMSUNG SDS VIETNAM

Customer name: SAMSUNG SDS VIETNAM CO., LTD

Project implementation location: Bien Hoa City, Dong Nai

Project implementation time: 2021

ESTEC provides the WinCC OA software license from Siemens and design and programming services to monitor power consumption, capacity and information of the entire plant. The system gives visual warnings and error statuses to help operators check the status and have a timely handling plan.

Read more
TRANSFORMER OIL PURIFICATION SERVICES - PHU MY 3 BOT POWER

TRANSFORMER OIL PURIFICATION SERVICES - PHU MY 3 BOT POWER

Investor: PHU MY BOT ELECTRICITY COMPANY LIMITED.

Location: Phu My, Ba Ria.

Contractor: Siemens EM.

Year: 2018.

Scope: Provision of Transformer Oil Re-generation services (Sitram-Reg).

Read more
ESTEC HAD SUPPLIED AND INSTALLED FLENDER GEARBOX

ESTEC HAD SUPPLIED AND INSTALLED FLENDER GEARBOX

End User: Hon Chong INSEE

Year: 2019, 2021

Scope of Work: In 2019 , 2021; ESTEC had supplied and installed Flender gearbox.

Read more
UPGRADE HARDWARE S5 TO S7 FOR STATIONS IP71, IP72

UPGRADE HARDWARE S5 TO S7 FOR STATIONS IP71, IP72

Customer Name: VICEM BUT SON CEMENT COMPANY.

Location: Thanh Son Commune, Kim Bang District, Ha Nam Province, Vietnam.

Industry: Cement.

Project Location: Thanh Son Commune, Kim Bang District, Ha Nam Province, Vietnam.

Year: 2020.

Read more
UPGRADE CONTROLLER CEMAT - INSEE THI VAI

UPGRADE CONTROLLER CEMAT - INSEE THI VAI

Investor: INSEE THI VAI TERMINAL.

Location: Phu My, Ba Ria, Vung Tau.

Year: 2017.

Scope: Upgrade CEMAT Controller.

Read more
PCS7 UPGRADE - LAM DONG ALUMINUM

PCS7 UPGRADE - LAM DONG ALUMINUM

Investor: LAM DONG ALUMINUM.

Location: Tan Rai, Lam Dong.

Year: 2017.

Scope: Upgrade Simatic PCS7 Coal Gas Workshop.

Read more
DCS SYSTEM FOR BUT SON CEMENT PLANT

DCS SYSTEM FOR BUT SON CEMENT PLANT

Investor: VICEM BUT SON CEMENT.

Location: Kim Bang, Ha Nam.

Year: 2016.

Scope: Upgraded control system software CEMAT V7; Upgraded weight scale and flow meter systems.

Read more
PERSONAL CARE PLANT 05TON MIXER – UNILEVER

PERSONAL CARE PLANT 05TON MIXER – UNILEVER

Investor: UNILEVER.

Location: Personal Care Plant, Cu Chi, HCMC

Year: 2014-2015

Scope: Control Cabinet, MCC; Local Cabling Control Cabinel

Read more
HOME CARE LIQUID PHASE 3 - UNILEVER

HOME CARE LIQUID PHASE 3 - UNILEVER

Investor: UNILEVER.

Location: Cu Chi, Ho Chi Minh City.

Year: 2014 - 2015.

Scope: Upgrade DCS and Batching System at Personal Care Plant.

Read more
ENERGY MANAGEMENT SYSTEM FOR VINAMILK DAIRY FARM

ENERGY MANAGEMENT SYSTEM FOR VINAMILK DAIRY FARM

- Customer name: Vietnam Dairy Cow One Member Company Limited (VINAMILK)

- Customer's address: 10 Tan Trao, Tan Phu ward, district 7, HCMC

- Industry: Food & Beverage (Food & Beverage) - Project implementation location: Mo Duc - Quang Ngai

- Project implementation time: 2021-2022

Read more
CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) - OUTSPAN

CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) - OUTSPAN

Investor: CAFÉ OUTSPAN VIETNAM COMPANY LIMITED.

Location: L1, Nhut Chanh Industrial Park, Nhut Chanh Commune, Ben Luc District, Long An.

Industry: Food & Beverage.

Year: 2019.

Scope: ESTEC designs, supplies equipment, constructs, monitoring system.

Read more
SUPPLYING EQUIPMENT AND CONTROL PRODUCTION OPERATION SYSTEM

SUPPLYING EQUIPMENT AND CONTROL PRODUCTION OPERATION SYSTEM

Investor: GREENFEED.

Location: Vinh Long.

Year: 2018.

Scope: ESTEC consulting and providing to GreenFeed usingTIA Portal V14 SP1 and SIMATIC S7-1500, ET200SP apply to monitor and control the production operation system, production reports for GreenFeed Vinh Long factory.

Read more
SUPPLYING CONTROL SYSTEM AND INSTRUMENTATION FOR BMS - TETRA PAK

SUPPLYING CONTROL SYSTEM AND INSTRUMENTATION FOR BMS - TETRA PAK

Investor: TETRA PAK.

Location: Binh Duong.

Year: 2018.

Scope:  ESTEC provided field equipment, sensors and BMS control system for the factory using TIA Portal V14 SP1 and PLC S7-1500 and SCADA Webfactory software to manage and optimize energy to ensure LEED certificate.

Read more
WASTE WATER TREATMENT PLANT - YKK

WASTE WATER TREATMENT PLANT - YKK

Investor: YKK.

Contractor: Kobelco.

Location: Nhon Trach, Dong Nai.

Year: 2016.

Scope: Supply and installation of control panels and MCC panels for Wastewater Treatment Plant.

Read more
ESTEC IMPROVES PRODUCTION EFFICIENCY FOR SBOEVN WITH OPCENTER SCHEDULING

ESTEC IMPROVES PRODUCTION EFFICIENCY FOR SBOEVN WITH OPCENTER SCHEDULING

ESTEC has implemented the Opcenter Scheduling solution to help SBOEVN optimize machine performance, shorten planning time, and enhance competitiveness.

We are proud to share a highlight project: ESTEC successfully deployed the advanced production scheduling solution Opcenter Scheduling for Schoeller-Bleckmann Oilfield Equipment Vietnam (SBOEVN). This success story has been recognized and published by Siemens as a featured global Case Study.

Read more
SUPPLY AND INSTALL XHQ OPERATIONS INTELLIGENCE SOFTWARE

SUPPLY AND INSTALL XHQ OPERATIONS INTELLIGENCE SOFTWARE

Customer name: Vicem Ha Tien Cement Joint Stock Company

Industry: Cement

Project implementation location: Binh Phuoc.

Project implementation time: 2021-2022

Read more
ESTEC IMPROVES PRODUCTION EFFICIENCY FOR SBOEVN WITH OPCENTER SCHEDULING

ESTEC IMPROVES PRODUCTION EFFICIENCY FOR SBOEVN WITH OPCENTER SCHEDULING

ESTEC has implemented the Opcenter Scheduling solution to help SBOEVN optimize machine performance, shorten planning time, and enhance competitiveness.

We are proud to share a highlight project: ESTEC successfully deployed the advanced production scheduling solution Opcenter Scheduling for Schoeller-Bleckmann Oilfield Equipment Vietnam (SBOEVN). This success story has been recognized and published by Siemens as a featured global Case Study.

Read more
SUPPLY AND INSTALL XHQ OPERATIONS INTELLIGENCE SOFTWARE

SUPPLY AND INSTALL XHQ OPERATIONS INTELLIGENCE SOFTWARE

Customer name: Vicem Ha Tien Cement Joint Stock Company

Industry: Cement

Project implementation location: Binh Phuoc.

Project implementation time: 2021-2022

Read more
SERVICE OF HENTING PROFESSIONALS FOR SUPERVISION AND MAINTENANCE

SERVICE OF HENTING PROFESSIONALS FOR SUPERVISION AND MAINTENANCE

Customer name: BRANCH OF VICEM HA TIEN Cement Joint Stock Company - BINH PHUC Cement Factory
Industry: Cement
Location: Thanh Binh Hamlet, Thanh Luong Commune, Binh Long Town, Binh Phuoc Province, Vietnam
Project implementation time: 2023
 

Read more
UPGRADING 80T TRUCK SCALELAM DONG ALUMIN PLANT

UPGRADING 80T TRUCK SCALE LAM DONG ALUMIN PLANT

Project Introduction:

  • Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
  • Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.

Read more
REPAIR OF GEAR BOX FOR MILL AT HA TIEN 1 PHU HUU

REPAIR OF GEAR BOX FOR MILL AT HA TIEN 1 PHU HUU

Investor: Xi Măng Hà Tiên 1

Location: Phú Hữu, TP. Hồ Chí Minh

Year: 7/2016

Read more
REMOTE MONITORING FOR GEAR UNITS

REMOTE MONITORING FOR GEAR UNITS

• Optimal for demanding applications such as cement, cranes, mining.

• Monitoring of complex drive trains

• Online data collection and recording

• Transfer of measured data to our Expert Center by secure data communication

• Qualified data analysis and diagnosis by our competent expert team

• Concrete action recommendations as well as early warnings in the event of failure

Read more
TRAINING ON SIMACTIC PCS7 PROGRAMMING - CLJOC

TRAINING ON SIMACTIC PCS7 PROGRAMMING - CLJOC

Investor: Cuu Long JOC

Location: Ho Chi Minh City

Year: 2016

Scope: Training on SIMACTIC PCS7 Programming

Read more
TRAINING ON SIMACTIC PCS7 PROGRAMMING - CLJOC

TRAINING ON SIMACTIC PCS7 PROGRAMMING - CLJOC

Investor: Cuu Long JOC

Location: Ho Chi Minh City

Year: 2016

Scope: Training on SIMACTIC PCS7 Programming

Read more
SERVICE OF HENTING PROFESSIONALS FOR SUPERVISION AND MAINTENANCE

SERVICE OF HENTING PROFESSIONALS FOR SUPERVISION AND MAINTENANCE

Customer name: BRANCH OF VICEM HA TIEN Cement Joint Stock Company - BINH PHUC Cement Factory
Industry: Cement
Location: Thanh Binh Hamlet, Thanh Luong Commune, Binh Long Town, Binh Phuoc Province, Vietnam
Project implementation time: 2023
 

Read more
UPGRADING 80T TRUCK SCALELAM DONG ALUMIN PLANT

UPGRADING 80T TRUCK SCALE LAM DONG ALUMIN PLANT

Project Introduction:

  • Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
  • Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.

Read more
REPAIR OF GEAR BOX FOR MILL AT HA TIEN 1 PHU HUU

REPAIR OF GEAR BOX FOR MILL AT HA TIEN 1 PHU HUU

Investor: Xi Măng Hà Tiên 1

Location: Phú Hữu, TP. Hồ Chí Minh

Year: 7/2016

Read more
ESTEC PROVIDING SIEMENS CONVEYOR BELT SCALING SYSTEM AT FORMOSA HA TINH IRON AND STEEL PLANT

ESTEC PROVIDING SIEMENS CONVEYOR BELT SCALING SYSTEM AT FORMOSA HA TINH IRON AND STEEL PLANT

Investor: Formosa Group - Taiwan

Location: Vung Ang Economic Zone, Ky Long Ward, Ha Tinh, Vietnam

Implementation time: 2023

Read more
ESTEC'S INDUSTRIAL ELECTRONIC SCALES SYSTEM PROVIDING CAPACITY

ESTEC'S INDUSTRIAL ELECTRONIC SCALES SYSTEM PROVIDING CAPACITY

ESTEC’s Industrial Weighbridge Solutions

With years of hands-on experience from major projects across Vietnam, ESTEC has built a strong reputation as a trusted partner for supplying, installing, and calibrating industrial weighing systems. We work with a wide range of industries — from steel and metallurgy to ports, logistics, energy, and manufacturing.

We are proud to be a strategic partner of METTLER TOLEDO, a world-leading brand in precision weighing technology. All equipment is fully imported, built for long life, high accuracy, and stable performance — even in harsh working environments.

Read more
PROJECT SUPPLYING 80T LORRY SCALES FOR HOA PHAT DUNG QUAT

PROJECT SUPPLYING 80T LORRY SCALES FOR HOA PHAT DUNG QUAT

Investor: Hoa Phat Dung Quat Steel Joint Stock Company

Project implementation place: Quang Ngai

Industry: Steel production

Year of implementation: 2022

Read more
PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT

PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT

Investor: Trung Nam Group (TNG)

Project implementation place: Ninh Thuan province

Industry: Seaport

Implementation time: 2022

Read more
 CO2 MONITORING IN COAL GAS GENERATOR

CO2 MONITORING IN COAL GAS GENERATOR

Project information: Project: Monitoring CO2 in gas generators of Coal Gas workshop

Investor: Lam Dong Aluminum One Member Company Limited – TKV

Project implementation location: Bao Lam - Lam Dong Completion time: January 2022

Read more
AIR ANALYZER FOR CHIMNEY - VIETNAM SUGAR

AIR ANALYZER FOR CHIMNEY - VIETNAM SUGAR

Investor:  Vietnam Sugar
Location: Khánh Hòa
Year:        2018
Scope:    Supplied and installed air analyzer for chimney

Read more
CONTROL SYSTEM FOR COD ANALYZER - AGC

CONTROL SYSTEM FOR COD ANALYZER - AGC

Investor:  AGC Chemicals Company
Location: Phu My, Ba Ria Vung Tau
Year:        2016
Scope:     Supplied and installed control system COD (Chemical Oxygen   
                 Demands) Analyzer
 

Read more
 CO2 MONITORING IN COAL GAS GENERATOR

CO2 MONITORING IN COAL GAS GENERATOR

Project information: Project: Monitoring CO2 in gas generators of Coal Gas workshop

Investor: Lam Dong Aluminum One Member Company Limited – TKV

Project implementation location: Bao Lam - Lam Dong Completion time: January 2022

Read more
CONTROL SYSTEM FOR COD ANALYZER - AGC

CONTROL SYSTEM FOR COD ANALYZER - AGC

Investor:  AGC Chemicals Company
Location: Phu My, Ba Ria Vung Tau
Year:        2016
Scope:     Supplied and installed control system COD (Chemical Oxygen   
                 Demands) Analyzer
 

Read more
ESTEC PROVIDING SIEMENS CONVEYOR BELT SCALING SYSTEM AT FORMOSA HA TINH IRON AND STEEL PLANT

ESTEC PROVIDING SIEMENS CONVEYOR BELT SCALING SYSTEM AT FORMOSA HA TINH IRON AND STEEL PLANT

Investor: Formosa Group - Taiwan

Location: Vung Ang Economic Zone, Ky Long Ward, Ha Tinh, Vietnam

Implementation time: 2023

Read more
PROJECT SUPPLYING 80T LORRY SCALES FOR HOA PHAT DUNG QUAT

PROJECT SUPPLYING 80T LORRY SCALES FOR HOA PHAT DUNG QUAT

Investor: Hoa Phat Dung Quat Steel Joint Stock Company

Project implementation place: Quang Ngai

Industry: Steel production

Year of implementation: 2022

Read more
AIR ANALYZER FOR CHIMNEY - VIETNAM SUGAR

AIR ANALYZER FOR CHIMNEY - VIETNAM SUGAR

Investor:  Vietnam Sugar
Location: Khánh Hòa
Year:        2018
Scope:    Supplied and installed air analyzer for chimney

Read more
ESTEC'S INDUSTRIAL ELECTRONIC SCALES SYSTEM PROVIDING CAPACITY

ESTEC'S INDUSTRIAL ELECTRONIC SCALES SYSTEM PROVIDING CAPACITY

ESTEC’s Industrial Weighbridge Solutions

With years of hands-on experience from major projects across Vietnam, ESTEC has built a strong reputation as a trusted partner for supplying, installing, and calibrating industrial weighing systems. We work with a wide range of industries — from steel and metallurgy to ports, logistics, energy, and manufacturing.

We are proud to be a strategic partner of METTLER TOLEDO, a world-leading brand in precision weighing technology. All equipment is fully imported, built for long life, high accuracy, and stable performance — even in harsh working environments.

Read more
PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT

PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT

Investor: Trung Nam Group (TNG)

Project implementation place: Ninh Thuan province

Industry: Seaport

Implementation time: 2022

Read more
(+84) 28 8886 8799 Leave message Facebook chat Facebook chat