Automation - Electrical SolutionsInvestor: UNILEVER.
Location: Cu Chi, Ho Chi Minh City.
Year: 2014 - 2015.
Scope: Upgrade DCS and Batching System at Personal Care Plant.
Investor: UNILEVER.
Location: Cu Chi, Ho Chi Minh City.
Year: 2014 - 2015.
Scope: Upgrade DCS and Batching System at Personal Care Plant.
INTRODUCTION
- Home Care Liquid Plant (HCL) is located in Unilever Cu Chisite. This is the biggest HCL plant of Unilever in term of capacity in SEA.
- The plant was built with PCS7 V7.2 andSimatic Batch for the first two phases from 2008 - 2012.
- ESTEC supplied the DCS system for the third phase.
- ESTEC provided HW, SW, engineering PCS7 and Batch, panel assembly, cabling, testing and commissioning.
- Hundreds of new phases were implemented and successfully commissioned.
CUSTOMER BENIFITS
- Very less shutdown time for the most busy plant of Unilever Vietnam.
- The project were delivered on time and followed production schedule.
- The third phase was implemented with less investment cost because of maximizing the use of existing resources.
- All the production recipes were backed up and reloaded, no lost of production data.
- The plant is optimized to increase capacity and flexibility.